---
title: "SunPath Solar Case Study - Upper Route Planner"
url: "https://www.upperinc.com/success-stories/sunpath-solar-installation-company/"
date: "2026-04-20T06:51:47+00:00"
modified: "2026-04-20T06:51:47+00:00"
author:
  name: "Riddhi Patel"
word_count: 1931
reading_time: "10 min read"
summary: "Home
               Customer Stories
               SunPath Solar
          
        
    
      
         
            SunPath Solar Cut Project Timelines by 30% with Geographic Route Opti..."
description: "SunPath Solar added 2 extra daily site visits fleet-wide and cut project timelines from 10 weeks to 7 using Upper Route Planner."
language: "en"
schema_type: "WebPage"
---

# SunPath Solar Case Study - Upper Route Planner

_Published: April 20, 2026_  
_Author: Riddhi Patel_  

## SunPath Solar Cut Project Timelines by 30% with Geographic Route Optimization

A Phoenix solar installation company managing 8 field crews and 15-25 daily site visits eliminated 20 minutes of average drive time between appointments, compressed project timelines from 8-10 weeks to 5-7 weeks, and resolved warranty disputes using timestamped photo documentation.

  ![SunPath Solar logo](https://www.upperinc.com/wp-content/uploads/2026/04/sunpath-solar-client-logo.png) In Conversation with Kevin Park, Operations Manager, SunPath Solar


---

_View the original post at: [https://www.upperinc.com/success-stories/sunpath-solar-installation-company/](https://www.upperinc.com/success-stories/sunpath-solar-installation-company/)_  
_Served as markdown by [Third Audience](https://github.com/third-audience) v3.5.3_  
_Generated: 2026-04-20 06:51:49 UTC_  
